- Ancillaries Overvew
- Installation Vessel: Worldwide Emergency Response Equipment General
- BOP installation: CAPPING STACKS, 0 DEGREES
- Accumulators: 16-LINE HFL WITH COBRA HEADS; 1” HSFL; DEPLOYMENT FRAME
- HFL Deployment Frame - SWRP Capping Stack System
- Accumulators: Assembly, 16 line Flying Lead 150 FT SWRP
- Assembly, 1" Line Flying Lead; 5 ksi; 150 FT
- Trendsetter shut in video
- CAPPING SYSTEM OPERATION GUIDELINES
- Volume 1 – System Data
- Volume 2 - SWRP Capping Stack System
- Volume 3 - Storage & Maintenance
- Volume 4 - Mobilization & Assembly
- Volume 5 - Installation Procedures & Operations Guidelines
- Capping stack
- Layout storage - 15k
- Transportation skid fastening study
- Assembly test stand
- Trendsetter fastening study
- South Africa VersionStorage and Maintenance Configuration
- Vessel Transport Configuration
- Deployment Configuration
- Slab Gate Valve 5 1/8" 15ksi
- 10,000 PSI SWRP Capping Stack
- Installation/Retrieval Choke Connection System
- Connection System
- Slab Gate Valve 7 1/16" 10ksi
- Spreader Bar O&M Manual
- Assembly, Spreader Bar
- Installation Procedure of Capping Stacks Inclined
- Assembly, Inclination Tool, SWRP Capping Stack
- 18-3/4”, 15K Model HC Collet Connector
- 18-3/4”, 15K Model HC/H4 Collet Connector
- Collet Connector Operation and Maintenance Manual
- Storage and Maintenance Configuration
- Vessel Transport Configuration
- Deployment Configuration
- Main Bore Isolation: BOP Assy, 18 - 15M, DBL, NXT, SXF
- Main Bore Isolation: O&M Manual
- Diverter Outlets: Slab Gate Valve 5 1/8" 15ksiV
- Installation/Retrieval Choke Connection System
- Connection System
- P&ID 15k Capping Stack
- 18-3/4”, 15K Model HC Collet Connector
- 18-3/4”, 15K Model HC/H4 Collet Connector
- Collet Connector Operation and Maintenance Manual
- Installation Procedure of Capping Stacks Inclined
- Assembly, Inclination Tool, SWRP Capping Stack
- Spreader Bar O&M Manual
- Assembly, Spreader Bar
- Capping Stack Connector Interfaces
- FLET Installation Sequence
- Layout, FLET with Connectors
- Layout, FLET System
- Schematic, FLET
- Layout, FLET Sub-Assembly
- Layout, Scope of Supply
- Burst Disc Selection Guidance
- Layout, 6-Slot Burst Disc Tree Assembly
- Rupture Disc Assembly
- GA- Rupture Disc
- FLET/Flowspool Connector Interfaces
- FLET Jumper Connector Interface
- FLET Jumper Connector Assembly
- Schematic, Flowspool Assembly
- GA, Flowspool with Completion Riser with LRP & EDP
- GA, Flowspool with Completion Riser with EDP Only
- ROV Tooling Technical Specification
- BOP Intervention Accumulator Charge Kit
- BOP Intervention Pre Checklist
- BOP Intervention Mission Plan
- BOP Intervention Pre Checklist
- BOP Intervention Mission Checklist
- Debris Clearance and Survey overview of ancillaries
- Debris Clearance Manual
- Debris Removal Checklist
- Debris Clearance Mission Plan
- Site Survey
- Site Survey Mission Checklist PDF
- Site Survey Mission Checklist Excel
- GUIDELINE FOR SURVEY AND POSITIONING
- Guide to Using the Offset Installation System
- Guide to Installation, Recovery and Operations
- SWR-SP-EN-REP-41654 System Description
- SWR-SP-OA-PRO-41603 Guideline for planning an Offshore OIS intervention
- SWR-SP-OA-DWG-41212 OIS - Subsea Layout drawing
- SWR-SP-OA-SPE-41526 GUIDELINE FOR SURVEY AND POSITIONING
- PULLING LINE AND DRAG CHAIN OPERATIONS PROCEDURE
- OIS subsea items deployment procedure
- PROCEDURE FOR CARRIER DEPLOYMENT AND SUBSEA OPERATIONS
- HORIZONTAL UMBILICAL AND WHIPLINE #1 DEPLOYMENT AND RECOVERY PROCEDURE
- VERTICAL UMBILICAL DEPLOYMENT AND RECOVERY PROCEDURE
- ANIMATION SHOWING SHUT-IN
- SIMOPS
- Description and capabilities
- Installation and Support Vessels
- Assembly, Testing and Load-out
- Survey Requirements
- Shear Requirements and Deployment
- Disassembly, Equipment Return and Decontamination
- Well Owner supplied equipment and spares
- SWR-WG-EN-DSB-00001 Offset installation System – Basis of Design
- SWR-TE-UA-PRO-00010 Installation Procedure of Capping Stack
- SWR-SP-OA-PRO-41521 Carrier towing procedure
- SWR-SP-OA-PRO-41515 OIS – GENERAL OFFSHORE INSTALLATION PROCEDURE
- SWR-SP-OA-PRO-41516 Pulling line and Drag Chain Operations Procedure
- SWR-SP-OA-PRO-41517 Horizontal Umbilical Installation Procedure
- SWR-SP-OA-PRO-41943 Vertical Umbilical Deployment and Recovery Procedure
- SWR-SP-OA-PRO-41518 OIS subsea items deployment procedure
- SWR-SP-OA-PRO-41519 Procedure for Carrier deployment and Subsea operations
- SWR-SP-OA-SPE-41579 Marine spread specification for OIS intervention
- SWR-SP-OA-REP-42029 Study on impact of use of dropped anchor for OIS