• Concepts
  • Documentation map

  •  Logistics Plan Capping & SIRT
  •  Ancillaries Overvew
  •  Installation Vessel: Worldwide Emergency Response Equipment General
  •  BOP installation: CAPPING STACKS, 0 DEGREES
  •  Accumulators: 16-LINE HFL WITH COBRA HEADS; 1” HSFL; DEPLOYMENT FRAME
  •  HFL Deployment Frame - SWRP Capping Stack System
  •  Accumulators: Assembly, 16 line Flying Lead 150 FT SWRP
  •  Assembly, 1" Line Flying Lead; 5 ksi; 150 FT
  •  Trendsetter shut in video
  •  CAPPING SYSTEM OPERATION GUIDELINES
  •  Volume 1 – System Data
  •  Volume 2 - SWRP Capping Stack System
  •  Volume 3 - Storage & Maintenance
  •  Volume 4 - Mobilization & Assembly
  •  Volume 5 - Installation Procedures & Operations Guidelines
  •  Capping and Containment SIMOPS
  •  Capping stack
  •  Layout storage - 15k
  •  Transportation skid fastening study
  •  Assembly test stand
  •  Trendsetter fastening study
  •  Installation Procedure of Capping Stacks Inclined
  •  Assembly, Inclination Tool, SWRP Capping Stack
  •  South Africa VersionStorage and Maintenance Configuration
  •  Vessel Transport Configuration
  •  Deployment Configuration
  •  Slab Gate Valve 5 1/8" 15ksi
  •  10,000 PSI SWRP Capping Stack
  •  Installation/Retrieval Choke Connection System
  •  Connection System
  •  Slab Gate Valve 7 1/16" 10ksi
  •  Spreader Bar O&M Manual
  •  Assembly, Spreader Bar
  •  Installation Procedure of Capping Stacks Inclined
  •  Assembly, Inclination Tool, SWRP Capping Stack
  •  18-3/4”, 15K Model HC Collet Connector
  •  18-3/4”, 15K Model HC/H4 Collet Connector
  •  Collet Connector Operation and Maintenance Manual
  •  Storage and Maintenance Configuration
  •  Vessel Transport Configuration
  •  Deployment Configuration
  •  Storage and Maintenance Configuration
  •  Vessel Transport Configuration
  •  Deployment Configuration
  •  Main Bore Isolation: BOP Assy, 18 - 15M, DBL, NXT, SXF
  •  Main Bore Isolation: O&M Manual
  •  Diverter Outlets: Slab Gate Valve 5 1/8" 15ksiV
  •  Installation/Retrieval Choke Connection System
  •  Connection System
  •  P&ID 15k Capping Stack
  •  18-3/4”, 15K Model HC Collet Connector
  •  18-3/4”, 15K Model HC/H4 Collet Connector
  •  Collet Connector Operation and Maintenance Manual
  •  Installation Procedure of Capping Stacks Inclined
  •  Assembly, Inclination Tool, SWRP Capping Stack
  •  Spreader Bar O&M Manual
  •  Assembly, Spreader Bar
  •  
  •  Video
  •  ANTONOV AN-124 Tech Sheet
  •  Volga Dnepr AN-124 Tech Sheet
  •  AN-124 Availability report
  •  Hardware and exercise delivery Close out report
  •  AFCS Airport and Loadability Study
  •  EDMS Complete Folder
  •  Assembly_disassembly choke flowlines
  •  EDMS Complete Folder
  •  Logistics Plan Containment
  •  SWRP Capping and Containment Guidelines
  •  Capping Stack Connector Interfaces
  •  FLET Installation Sequence
  •  Layout, FLET with Connectors
  •  Layout, FLET System
  •  Schematic, FLET
  •  Layout, FLET Sub-Assembly
  •  Layout, Scope of Supply
  •  Burst Disc Selection Guidance
  •  Layout, 6-Slot Burst Disc Tree Assembly
  •  Rupture Disc Assembly
  •  GA- Rupture Disc
  •  FLET/Flowspool Connector Interfaces
  •  FLET Jumper Connector Interface
  •  FLET Jumper Connector Assembly
  •  Schematic, Flowspool Assembly
  •  GA, Flowspool with Completion Riser with LRP & EDP
  •  GA, Flowspool with Completion Riser with EDP Only
  •  Response Plan Basis Template
  •  Response Time Modeling
  •  Response Time Modeling Base Case 2 legs
  •  SIRT Installation and Operation Manual
  •  EDMS Complete Folder
  •  Logistics Plan SIRT
  •  ROV Tooling Technical Specification
  •  BOP Intervention Accumulator Charge Kit
  •  BOP Intervention Pre Checklist
  •  BOP Intervention Mission Plan
  •  BOP Intervention Pre Checklist
  •  BOP Intervention Mission Checklist
  •  Debris Clearance and Survey overview of ancillaries
  •  Debris Clearance Manual
  •  Debris Removal Checklist
  •  Debris Clearance Mission Plan
  •  Site Survey
  •  Site Survey Mission Checklist PDF
  •  Site Survey Mission Checklist Excel
  •  Chemical Delivery Requirements
  •  Capping dispersant w Drillpipes checklist
  •  Dispersant Mission Plan
  •  Capping dispersant injection_mission cheklist
  •  WCM docs in EDMS
  •  System Description
  •  OIE folder on EDMS
  •  PULLING LINE AND DRAG CHAIN OPERATIONS PROCEDURE
  •  OIS subsea items deployment procedure
  •  PROCEDURE FOR CARRIER DEPLOYMENT AND SUBSEA OPERATIONS
  •  HORIZONTAL UMBILICAL AND WHIPLINE #1 DEPLOYMENT AND RECOVERY PROCEDURE
  •  VERTICAL UMBILICAL DEPLOYMENT AND RECOVERY PROCEDURE
  •  ANIMATION SHOWING SHUT-IN
  •  SIMOPS
  •  Description and capabilities
  •  Installation and Support Vessels
  •  Assembly, Testing and Load-out
  •  Survey Requirements
  •  Shear Requirements and Deployment
  •  Disassembly, Equipment Return and Decontamination
  •  Well Owner supplied equipment and spares
  •  SWR-WG-EN-DSB-00001 Offset installation System – Basis of Design
  •  SWR-TE-UA-PRO-00010 Installation Procedure of Capping Stack
  •  SWR-SP-OA-PRO-41521 Carrier towing procedure
  •  SWR-SP-OA-PRO-41515 OIS – GENERAL OFFSHORE INSTALLATION PROCEDURE
  •  SWR-SP-OA-PRO-41516 Pulling line and Drag Chain Operations Procedure
  •  SWR-SP-OA-PRO-41517 Horizontal Umbilical Installation Procedure
  •  SWR-SP-OA-PRO-41943 Vertical Umbilical Deployment and Recovery Procedure
  •  SWR-SP-OA-PRO-41518 OIS subsea items deployment procedure
  •  SWR-SP-OA-PRO-41519 Procedure for Carrier deployment and Subsea operations
  •  SWR-SP-OA-SPE-41579 Marine spread specification for OIS intervention
  •  SWR-SP-OA-REP-42029 Study on impact of use of dropped anchor for OIS
  •  Guide to Using the Offset Installation System
  •  Guide to Installation, Recovery and Operations
  •  SWR-SP-EN-REP-41654 System Description
  •  SWR-SP-OA-PRO-41603 Guideline for planning an Offshore OIS intervention
  •  SWR-SP-OA-DWG-41212 OIS - Subsea Layout drawing
  •  SWR-SP-OA-SPE-41526 GUIDELINE FOR SURVEY AND POSITIONING



  •  Boeing 727
  •  Hercules
  •  WASP
  •  UKCS
  •  Request form
  •  463 Deepwater Wells
  •  464 Capping & Containment
  •  465 Oil spill response
  •  592 Subsea Capping RTM Toolkit User Guide
  •  594 SCERP Guide for Subsea Wells
  •  595 Subsea Capping Stack Design and Operability Assessment
  •  EDMS Complete Folder
  •  EDMS Complete Folder